Drape Index
Draping
Basic Slack
steps 1-52
Introduction
Take measurements
(1-7)
Back muslin preparation: Hip and crotch depth
(8-14)
Back muslin preparation: Hip arc
(15-17)
Back muslin preparation: Creaseline
(18-20)
Back muslin preparation: Crotch curve
(21-22)
Back muslin preparation: Leg opening and inseam
23
|
24
|
25
|
26
|
27
|
28
Front muslin preparation
(29)
Pin prepared muslin to form
(30-34)
Front drape
(35-40)
Back drape
(41-47)
Pin side seams
(48-50)
Completed drape
(51-52)
Completed back muslin preparation.
23
24
25
26
27
28